
LACSD project in-progress by the Sancon Team
Sancon Completes 48″ CIPP Project for LACSD (sponsored)
Sponsored Post, Written by Sancon, Collection Systems, Technology and Innovation
Sancon was contracted by Steve Bubalo Construction company to perform the 48” cured-in-place-pipeliner for Los Angeles County Sanitation Districts project.
Scope of the project included CIPP lining of 595 LF of 48” CIPP, a portion of which, was through a siphon.
Over the course of the job, multiple installations were performed to comply with LACSD and City of Long Beach traffic control and excavation requirements.
Advertisement
RELATED NEWS
see all newsJOB OPENINGS
- Mechanical Maintenance Coach (Supervisor) at Union Sanitary District (Union City, CA, USA)
- Senior Utilities Operations Specialist at Tahoe City Public Utility District (Tahoe City, CA, USA)
- Construction Inspector/Senior Construction Inspector at Citrus Heights Water District (Citrus Heights, CA, USA)
- Watermaster at Santa Margarita River Watershed (Fallbrook, CA, USA)
Upcoming Events
This website uses cookies
Cookie SettingsACCEPTPrivacy & Cookies Policy
Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.