Image of the California Water Environment Association logo
Plant Maintenance Certification

Online Candidate Handbook / 1999-2000

                              CWEA Home    Technical Certification Home     Print Entire Handbook

Image of man searching with a telescopeLooking for a job? Try CWEA's Job Opportunities Web Page!

<<Click Here>>

 

Handbook Contents

closed.gif (903 bytes)Introduction      
closed.gif (903 bytes)Important Information
closed.gif (903 bytes)Program Structure
closed.gif (903 bytes)Plant Maintenance Tech. I
closed.gif (903 bytes)PM Mechanical Technologist II
closed.gif (903 bytes)PM Mechanical Technologist III
closed.gif (903 bytes)Electrical/Instrumentation II
closed.gif (903 bytes)Electrical/Instrumentation III
closed.gif (903 bytes)Plant Maintenance Tech.  IV
open.gif (936 bytes)Sample Test Questions
      Plant Maintenance I
      Mechanical Tech. II
      Mechanical Tech III
      Elect./Instr. II
      Elect./Instr. III
      Plant Maintenance IV
closed.gif (903 bytes)Selected References
closed.gif (903 bytes)Preparing for Your Test
closed.gif (903 bytes)Frequently Asked Questions

 

Plant Maintenance Technologist Grade 1
Sample Test Questions

For each question, choose the single most correct answer.

<<click here for answer key>>
<<Click here for Math Formulas and Conversion Factors>>

Question #1
To recess a hole for a fillister-head screw you must:

a) countersink.
b) counterbore.
c) spot fact.
d) center drill.

Question #2
Which tool is used when measuring screw pitch?

a) Ruler
b) Thread gage
c) Dial indicator
d) Slide calipers

Question #3
A concrete slab needs to be poured. The rectangular slab is to be 17 feet long and 13 feet wide with a depth of 4 inches. How many cubic yards of concrete will be needed?

a) 73.67 cubic yards
b) 32.74 cubic yards
c) 2.73 cubic yards
d) 5.46 cubic yards